Four steps
from the feasibility study to the connecting railway
Rail Cargo Austria’s connecting railway experts have a long-standing
experience and an extensive knowledge when it comes to the realisation of
connecting railway projects. They will provide support in all stages on the way
to your own connecting railway.
1. Feasibility study
- Customer requirement
- Site inspection or site selection/assessment
- Technical feasibility check
- Check of interface with ÖBB Infrastruktur AG
- Rough planning (drawing)
- Rough cost estimate
2. Economic feasibility study
- Economic feasibility study for the entire project
- Consultation regarding subsidy options from public funds
3. Detailed planning / preparation of construction measures
- Detailed planning ready for submission
- Submission to the competent railway authorities
- Legal procedure
- Notification “Construction and Operation of Connecting Railway“
4. Construction / operation of connecting railway
- Tendering of construction works
- Award of construction contracts
- Construction of connecting railway
- Contractual arrangements
- Commissioning of connecting railway